Match-cast crosshead mould
|
CIQ project, Johor Bahru, Malaysia
|
|
Maju Expressway project, KL - Putrajaya Malaysia
|
|
Viaduct link project at Jalan Batu Caves, KL, Malaysia
|
Precast crosshead method was a better choice for the construction of flyover bridge or vehicular viaduct as there was existing traffic below the viaduct. This avoided disrupting existing traffic. Floodlit's long line match-cast moulds were used for the above mentioned projects
Precast Moulds
System formwork